project的例句(project在句子中的用法)
-
Temporary projects include temporary cofferdam project and protection project of ancient relics.
临时附属工程主要是临时围堰工程和文物防护工程.
-
The other part is temporary cofferdam and the rear land - based connection project.
二是临时围堰及后方陆域连接工程.
-
Above service project is with clausal provision accurate.
以上服务项目以条款规定为准.
-
The emergence of this project takes the lead in promoting the value of circumjacent commerce.
本案推出后,率先带动提升了周边商业的价值.
-
Predict 2000, project kind adhesive, chlorin glue and propylene latex glue will have bigger growth.
预计到2000年, 工程类胶粘剂 、 氯了胶及丙烯乳液胶将有较大增长.
-
The money saved from the cessation of the road project will be invested in public transport.
停止筑路项目省下的资金将投入公共交通.
-
World - renowned cellist Yo - Yo Ma founded The Silk Road Project in 1998.
世界闻名的大提琴家 马友友 于1998年创建了丝路工程.
-
Maple Hill East project Catalpol Park, west of a three - center and the provincial museum landscape axis.
项目东倚梓枫公园 、 西望三馆一中心和省府景观轴.
-
He is already the general engineer of this low BTU water gas project.
他已经是这个低热水煤气工程的总工程师了.
-
Quan and Bray, a London - based married couple, invested heavily in the project.
来自伦敦的全莉 、 博锐夫妇在该项目中有大量投资.
-
The new wonders project was the brainchild of Swiss businessman Bernard Weber.
“世界新七大奇迹”由瑞士商人贝尔纳·韦伯先生创立的.
-
The project financing and constructing patterns of BOT have widely applying space.
BOT这种 项目融资和建设模式,在我国有广阔的应用空间.
-
The idea that introduces BOT investment in environmental protection project is proposed.
阐述了实施BOT项目的可行性及实施BOT对我国环保设施建设的意义.
-
Implement project management according to the project management process of BOS.
按BOS项目管理程序实施项目管理.
-
The full project about measuring the stability of metro bogie was presented.
给出了测试地铁转向架平稳度的完整方案.
-
Continuous hot dip galvanizing line a biggish electrical control project which is complex for control logic.
连续热镀锌生产线是较大型的电气控制项目,控制逻辑较为复杂.
-
The Channel Tunnel project is the biggest civil engineering project in Europe.
英吉利海峡隧道是欧洲最大的土木工程。
-
And term risk models of the assistance project worked out on the basis of BANT - GERT method.
尝试建立基于 BANT -GERT网络的援外项目工期风险评估模型.
-
Perhaps the most significant cost - cutting project involves automating selected calibration procedures.
也许削减成本最显著的项目就是自动选择的校准规程.
-
Take action as Project Manager, assort with the whole selling process.
能独立行使项目经理的职能, 协调项目从售前咨询到售后服务协调的全过程.